- Excavate 1 ft. on either side of the window, down to the base of the footing.
- Clean the exposed wall thoroughly.
- Mud Monkeys then fills all holes and/or cracks in the foundation wall with hydraulic cement.
- We then cement coat the entire exposed foundation area from the base of the footing to 3 inches above the finished grade level.
- After the cement coating is thoroughly dry, a foundation coating of tar is applied over the cemented area with 6 mil plastic adhered to the tar.
- We then install a 4 inch clothed continuous weeping tile at the base of the footing and cover it with 12″ of 3/4″ gravel
- A leg of weeping tile is brought up the center of the window as a relief point for any water sitting in the well.
- Then we back-fill the excavated area, compacting the dirt every foot in order to minimize any settling that might occur.
- A galvanized metal window well is installed 3″ above grade and filled with gravel.
- Mud Monkeys then slopes the final grade away from the house.